You are here Transceivers (Force10) CBL-10GSFP-DAC-10M

Dell (Force10) CBL-10GSFP-DAC-10M Compatible 10G SFP+ Active Copper Twinax Cable, 10m (33ft)

Dell (Force10) CBL-10GSFP-DAC-10M Compatible 10G SFP+ Active Copper Twinax Cable, 10m (33ft)

This 10m (33ft) (Force10) CBL-10GSFP-DAC-10M compatible assembly provides 10G DAC connectivity for Dell interfaces in a SFP+ to SFP+ configuration. It is supplied as one complete cable, with specifications and installation guidance that help high-density racks balance reach, connector access and airflow while retaining the exact OEM reference required by the host.

OEM Part Number: (Force10) CBL-10GSFP-DAC-10MHT Part Number: (Force10) CBL-10GSFP-DAC-10M

Product Highlights

  • Compatible alternative to Dell (Force10) CBL-10GSFP-DAC-10M
  • 10G connectivity at 10Gbps
  • Interface configuration: SFP+ to SFP+
  • Fixed length and part number: 10m (33ft), (Force10) CBL-10GSFP-DAC-10M
  • Cable construction: Active Twinax
  • Conductor specification: 26AWG
  • Maximum power consumption: ≤0.5W
  • Minimum bend radius: 30mm

Specifications

HT Part Number(Force10) CBL-10GSFP-DAC-10M
Dell (Force10) CompatibleCBL-10GSFP-DAC-10M
ManufacturerHT
Connector TypeSFP+ to SFP+
Max Data Rate10Gbps
Minimum Bend Radius30mm
Wire AWG26AWG
Cable Length10m (32.81ft)
Jacket MaterialPVC (OFNR)
Cable TypeActive Twinax
Temperature0 to 70°C (32 to 158°F)
Power Consumption≤0.5W
Power Supply3.3V
Protocols1x InfiniBand QDR, DDR, SDR, 10 Gigabit Ethernet, Fibre Channel

Power and Thermal Planning

The rated power consumption is ≤0.5W. Include this load in the host-port power and thermal budget, especially in densely populated switches. Maintain front-panel clearance and do not bundle the cable so tightly that it obstructs airflow around the connectors.

Position Within the Length Range

(Force10) CBL-10GSFP-DAC-10M is the longest of 5 verified length options in this family. Compared with (Force10) CBL-10GSFP-DAC-7MA at 7m (23ft), it provides 3m of additional reach for a longer vertical drop, a wider rack or an adjacent-cabinet route. Confirm that the complete path requires this length, because unused slack still needs supported, bend-safe storage.

High-Density Rack Integration

In a densely populated rack, connector access and airflow are part of the link design. Choose the shortest length that follows the managed path comfortably, avoid tight bundles around the connector housings and preserve room for latch operation. Where power consumption is listed, include every populated interface in the host thermal budget rather than assessing a single cable in isolation. For this assembly, the listed conductor specification is 26AWG; the minimum bend radius is 30mm; the stated power consumption is ≤0.5W; the jacket material is PVC (OFNR).

Cable Construction and Routing

This assembly uses 26AWG conductors, PVC (OFNR) jacket, minimum bend radius 30mm. These mechanical characteristics affect how the cable should be dressed behind the equipment. Avoid sharp edges, excessive ties and repeated tight bends close to the connector boots.

Network and Protocol Considerations

The intended application is determined by the host interface and protocol support. Listed interface and protocol references include 1x InfiniBand QDR, DDR, SDR, 10 Gigabit Ethernet, Fibre Channel. Confirm that the host firmware and port configuration support the same operating mode.

Passive Copper Operation

A passive DAC has no separate optical conversion stage. Its low-power, low-latency operation is useful for short equipment links, but the assembly must remain within the length and signaling mode accepted by both hosts.

Length Selection and Installation Planning

Longer assemblies require disciplined cable dressing. For (Force10) CBL-10GSFP-DAC-10M at 10m (33ft), use the intended managers rather than a diagonal route across the rack, and leave enough space to release each connector. Any service allowance should be loose and supported, with the complete copper assembly and both connector housings protected throughout the path. The next shorter verified assembly is (Force10) CBL-10GSFP-DAC-7MA at 7m (23ft), which is the better comparison when the managed route leaves substantial unused cable.

Quality Assurance and Packaging

Each assembly receives a visual connector inspection and functional link check before it is coiled and protected. Packaging is selected to avoid compressing the cable into a tight bundle, and optional rack-based labels help maintain an orderly installation when many identical interfaces are populated together. Neutral packaging and customer-specific packing documentation are available on request.

Ordering Information

Provide the exact part number, length, quantity and target interface density. For multi-rack projects, list each length separately and identify any preferred carton grouping. Host model and software information can be included for a compatibility review before production or dispatch. Keep (Force10) CBL-10GSFP-DAC-10M associated with 10m (33ft) throughout the order and receiving record.

Dell Compatibility and Factory Testing

The assembly is evaluated for host recognition and stable link operation, with diagnostics checked where the interface provides them. This approach verifies more than electrical or optical continuity. Exact platform and firmware information remains valuable in high-density deployments because port mode and qualification policy can differ within the same connector family. Both connectors are examined before the operating test, which includes link stability and diagnostic indications.

Frequently Asked Questions

Is this an original Dell cable?

No. It is an HT-manufactured compatible alternative for equipment that specifies Dell (Force10) CBL-10GSFP-DAC-10M.

Can different brands be connected with the same assembly?

Only where both hosts explicitly support the complete interface and compatibility arrangement. Document each end and select the appropriate brand-specific product when required.

Does this order code cover multiple lengths?

No. (Force10) CBL-10GSFP-DAC-10M refers here to 10m (33ft). Every other verified length has a separate part number and page in the length list.

Are separate transceivers or patch leads required?

No. This is one complete direct-attach assembly. The ends are not detachable modules and should not be separated from the cable.

Shipping and Lead Time

Available stock is normally prepared for dispatch within one to three working days, while larger production requirements are scheduled with the order. Worldwide courier services are available, with air or sea freight for consolidated shipments; freight-collect delivery and coordination with a customer’s logistics provider can be arranged.

Singapore Fiber Optics

Fiber Optic Singapore

Singapore Service center: Singapore 567711

Factory in Asia: Shangxue Industrial Area, Shenzhen

Products Datasheet

Our full product range is available as PDF datasheets for download.

For any general inquiry, please email info@huihongfiber.com and we will reply with details.

Customer Support

For customer support, please email sales@huihongfiber.com; our Singapore team will get back to you as soon as possible.